Quantcast
Channel: Intermat 2012 - News - Concrete Placement, Formwork, and Structures
Viewing all articles
Browse latest Browse all 22

Sateco launches lift shaft podium

$
0
0
Sateco says its new lift shaft podium (PCA) makes it possible to block and secure access to lift shafts during building work. It also maximises secure work and material storage space during the time it takes to build up concrete shells. Due to its adjustable telescopic feet and the dimension markings every 10cm along its adjustment pipes, it can be perfectly adjusted between heights of 2.7m and 4m. Its wooden working platform can also be extended using sliding cross-pieces that require neither screws nor na

Viewing all articles
Browse latest Browse all 22

Trending Articles